DISCLAIMER – TMWA BID# 2019-008
Eastern Sierra Engineering (ESE) is in the process of conducting a Geotechnical Investigation and Pavement Design Report for the RTC Reno Consolidated 19-03 project. The Report will not be completed until late-May, 2019, however, ESE has provided a preliminary findings letter that pertains to Ralston Street. The preliminary findings letter dated February 12, 2019, (The Letter) has been posted on the TMWA website for informational purposes only. It is provided without representation or warranty of any kind by TMWA with respect to its accuracy or completeness. The Letter is not intended to, and shall not be relied upon, as a substitute for, or a supplement to, the independent investigation of site conditions by the Bidder. The Letter is not part of the Contract Documents, and the provisions of Section 2.11 of the General Conditions apply to any use of such Letter. No conclusions or interpretations based on the information contained in The Letter will relieve the Contractor from fulfilling its obligations under the Contract Documents.
Geotechnical Investigation and Pavement Design Report - Ralston Street - University to 9th