Disclaimer

TMWA understands Stantec Consulting Services hired a subconsultant, Construction Materials Engineers, Inc. (CME), to conduct geotechnical investigations to provide information in support of the civil engineering design for the Arrowcreek Drought Response Project.  CME’s report titled “Geotechnical Investigation, TMWA Arrow Creek Drought Project, Arrow Creek Well 1, Copper Cloud and STMGID Well 11, Reno, Washoe County, Nevada”, (The Report) has been posted on the TMWA website for informational purposes only and is provided without representation or warranty of any kind by TMWA with respect to its accuracy or completeness.  The Report is not intended to and shall not be relied upon as a substitute for, or a supplement to, the independent investigation by the Bidder of site conditions.  The Report is not part of the Contract Documents, and the provisions of Section 2.11, General Conditions, apply to any use of such report.  No conclusions or interpretations based on the information contained in The Report will relieve the Contractor from fulfilling its obligations under the Contract Documents.

Geotechnical Investigation, TMWA Arrowcreek Drought Response Project, PWP# WA-2015-260