Disclaimer
Construction Materials Engineers, Inc. (CME) was contracted by the Truckee Meadows Water Authority to conduct a geotechnical investigation for the proposed alignment for the North Valley Integration pipeline improvement project. Borings, test pits and general geotechnical exploration was undertaken by CME in order to complete and provide a summary report and recommendations for the project. The report entitled, “Geotechnical Investigation, North Valley Alignment, North Reno and Lemmon Valley – Washoe County, NV” (The Report) has been posted on the TMWA website for informational purposes only and is provided without representation or warranty of any kind by TMWA with respect to its accuracy or completeness. The Report is not intended to and shall not be relied upon as a substitute for, or a supplement to, the independent investigation by the Bidder of site conditions. The Report is not part of the Contract Documents, and the provisions of Section 2.11, General Conditions, apply to any use of such report. No conclusions or interpretations based on the information contained in The Report will relieve the Contractor from fulfilling its obligations under the Contract Documents.
Geotechnical Investigation – Report – PWP# WA-2016-011