Disclaimer

Construction Materials, Engineers, Inc., (CME), was contracted through the Truckee Meadows Water Authority, to conduct a geotechnical investigation for the proposed Improvement Plans for the Washoe Forebay Spillway Channel Replacement project.   Exploratory drilling and geologic mapping were utilized for the geotechnical exploration undertaken by CME in order to complete and provide a report and recommendations for the project.   The report entitled, “Geotechnical Investigation, Washoe Forebay Spillway Channel Replacement, Mogul, Washoe County, Nevada” dated August 2016, (The Report) has been posted on the TMWA website for informational purposes only.  It is provided without representation or warranty of any kind by TMWA with respect to its accuracy or completeness.   The Report is not intended to, and shall not be relied upon, as a substitute for, or a supplement to, the independent investigation of site conditions by the Bidder.  The Report is not part of the Contract Documents, and the provisions of Section 2.11 of the General Conditions apply to any use of such report.  No conclusions or interpretations based on the information contained in The Report will relieve the Contractor from fulfilling its obligations under the Contract Documents.

Geotechnical Investigation: Washoe Forebay Spillway Channel Replacement, August, 2016